Mount Polley Environmental Monitoring

Environmental monitoring programs and closure research projects at Mount Polley mine site continue as planned. Remediation construction at the lower Hazeltine Creek and Edney Creek began this summer. Mount Polley staff, with assistance from Golder Associates Ltd., have begun development of the 2022 Water Management Plan.

Monitoring activities include regular water quality and toxicity sampling at:

  • water treatment plant (WTP) 
  • surface waters of Polley Lake, Bootjack Lake, Hazeltine Creek, Edney Creek & Quesnel Lake
  • mine contact waters including groundwater & mine seepage with flow rates

Regular inspections of all critical ditches, sumps, ponds, pumping systems and pipelines.

Ongoing surveys and studies include:

  • spawning activity in Hazeltine & Edney Creeks
  • remediated terrestrial habitats; vegetation growth, nesting sites and wildlife usage
  • aquatic habitats; fish population & tissue, zooplankton, phytoplankton, benthic invertebrates and sediments in Bootjack, Polley & Quesnel Lakes
  • dilution modelling of the Quesnel Lake discharge
  • semi-passive and passive water treatment options for closure which include a constructed wetland treatment system pilot study and a saturated rock fill bench scale test
Tour of aquatic habitat construction in lower Hazeltine Creek
Tour of aquatic habitat construction in lower Hazeltine Creek
Hazeltine Creek Reach One revegetated riparian area
Categories
Remediation

Major milestones of Mount Polley’s environmental remediation efforts to date

The remediation effort at Mount Polley is ongoing; however, we are very proud of the major milestones that have been completed to-date.

  1. Repair of lower Edney Creek, re-establishment of link to Quesnel Lake and installation of new fish habitat for spawners from Quesnel Lake, completed in spring 2015, with evidence of successful spawning by Interior Coho, Kokanee and Sockeye Salmon.
  2. Completion of construction of a new Hazeltine Creek channel in May 2015, to control erosion and provide base for remediation of the creek itself and the creek valley.
  3. Ongoing planting of native trees and shrubs in the riparian and upland areas along the creek, now totally more than 600,000 trees and shrubs planted.
  4. Installation of over 6 kilometres of new fish spawning and rearing habitat in upper to middle Hazeltine Creek. Evidence of successful 2018 and 2019 Rainbow trout spawning in upper Hazeltine Creek.
  5. Clean-up and repair of 400 metres of Quesnel Lake shoreline, including placement of new fish spawning gravels.
  6. Re-establishment of wetlands in the Polley Flats area adjacent to the repaired TSF.
Hazeltine Creek aerial view
Hazeltine Creek recovery work. An aerial view of the environmental remediation efforts captured by a drone.